U of C Aquatic Centre

These photos are for the 2008 pool shutdown where Crystal Services acquired, customized and constructed a movable scaffolding system to span over the pool so that the demolition, electrical and painting work could be performed in the high ceiling areas. Four boom lifts were also used to reach other areas. Construction work occurred simultaneously in the mechanical plant under the pool deck. Work inside the pool basin occurred only when the scaffolding system was moved out of the area.