Charleswood Split Level

The existing projection was reinforced with steel brackets secured to the foundation wall. Demolition to the walls of the projection ended up being more extensive than anticipated upon discovery of some significant water damage to the existing structure. A flush beam was installed to replace a dropped beam in the living room to enhance the ceiling.

Go To project Photos